Apr 5
Bid ended

T15-155 Phase One Gas Extension #13003

Town of Shannon, MS (T-NR-E)

Status

Bidding Closed

Bid Date4/5/23 10:00am

Company & Contacts

Engineering Solutions, Inc
Brett Brooks  
bbrooks@esi-ms.com

Sealed bids for the construction of PHASE ONE GAS EXTENSION,  TOWN OF SHANNON, MS. Bids will be received by Town of Shannon, in the Board Room, 225 Broad Street, Shannon, MS 38868, until 10:00 a.m., April 5th 2023 and then at said office publicly opened and read aloud.

Contract Documents, including Drawings and Specifications,  may be examined at the office of Engineering Solutions,  Inc., located at 1324 N. Veterans Blvd., Tupelo, Mississippi, and also can be viewed and/or purchased at Engineering Solutions, Inc. plan room at www.esiplans.com .

SCOPE OF WORK: The Project will be let as a single contract and consists of approximately 9,500 feet of2 inch and  linch  polyethylene gas line.

Project  Engineer:    Brett  Brooks,  PE, · Engineering  Solutions,  Inc.  ·   180 Magee  Drive,  Pontotoc,  MS  38863  · (662)489-1525 · bbrooks@esi-ms.com

Bids  will be received for a single  prime Contract.    Bids shall  be unit price  basis as  indicated  in the Bid  Form. Contract  Documents,  including Drawings  and Specifications,  are  being made available  via paper copy  or digital copy. Plan holders are required to log-in or register for a plan room account at  www.esiplans.com  to view and order Bid Documents.   All plan holders are required to have a valid email address for registration.   Bid Documents  are non-refundable  and must be purchased through the website.   For anyone interested in submitting  bids electronically in place of sealed bid, they may do so only through  www.esiplans.com .  Questions regarding website registration, online  orders or electronic bidding requirements,  please contact Plan House Printing in Tupelo, MS at (662)  407- 0193 or email  tupelo@planhouseprinting.com .  Partial sets of Bidding Documents will not be available and neither

Owner  nor Engineer will be responsible for full or partial sets of Bidding Documents,  including  Addenda  if any, obtained from sources other than the plan room.

SUBMITTAL  OF ELECTRONIC BIDS: Each electronically submitted bid must be submitted in "pdf' format and shall contain the same information and forms as required for the paper bids. Note - electronic bids must be secured with a bid bond.  In the event that an electronically submitted bid has a corrupted attachment, the bid will be considered  null and void by the owner.

Each bid submitted must be marked on the outside "Bid for: Phase  One Gas Extension, , Town of Shannon, MS

and CDBG  PROJECT #1137-20-334-PF-01".

A satisfactory Bid Bond executed by the Bidder or an accepted Surety, a certified check, or bank draft payable to the

TOWN OF SHANNON, on negotiable U.S. Government Bonds (at par value), shall be submitted with each bid in an amount equal to five percent (5%) of the total bid.

This project is being funded in part by the Community Development Block Grant #1137-20-334-PF-01 and the rules and regulations therein apply.

The successful bidder must comply with Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C.

1701 u).  CDBG regulations governing the grant require that, to the greatest extent feasible opportunities for contracting,  subcontracting, training and employment arising in connection with this CDBG project will be extended to Section 3 businesses and Section 3 residents.

Minority and Woman Owned Business Enterprises are solicited to bid on this contract as prime contractors and are encouraged  to make inquiries regarding potential subcontracting  opportunities, equipment, material and/or supply needs.

Town of Shannon is an Equal Opportunity Employer,  and hereby notifies all Bidders will be afforded the full opportunities  to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other

legally protected status in consideration for an award.

The successful bidder must comply with the Davis-Bacon  Act which requires that all laborers and mechanics shall be paid at rates not less than those determined  by the Department of Labor to be prevailing for the locality in which the project is located.

 Paul Lyles, Mayor

Town of Shannon

Advertisement  Dates: March 7th & March 14th